US
0 suggestions are available, use up and down arrow to navigate them
What job do you want?

Apply to this job.

Think you're the perfect candidate?

Process Technician I

Careers Integrated Resources Inc Hickory, NC (Onsite) Contractor
Job Title: Process Technician I
Location: Hickory, NC
Duration: 5 months, possible extension
 
Job Description:
Summary:
  • Encompasses the application of scientific and technological principles concerned with a continuous or periodic system of operations or activities in the production of manufactured products.
  • Designs and plans layout for such processes as hardening, washing, laminating, etching, engraving, polishing, plating, and other material-processing operations.
  • Plans sequence of operations and specifies procedures for cutting, shaping, and otherwise preparing basic material, exercising judgment in compromising between conflicting requirements, economic evaluation of methods, and operator effectiveness and comfort.
  • Conducts tests and measurements throughout stages of production to determine control over such variables as temperature, density, specific gravity, pressure, and viscosity.
 
Requirements:
  • Requires moderate understanding of the general aspects of the job and a familiarity with terminology and procedures.
  • Follows previously defined procedures. Proposes and implements basic solutions to routine problems.
  • Refers atypical or complex problems to others. Works under close site supervision. Provided instructions for routine work.
  • Recommends actions to improve efficiency. Able to perform duties within prescribed timeframes and maintain confidentiality.
  • Contacts are primarily within the immediate work group.
 
Education:
  • AAS
 
Desired Experience:
  • 0-3 Years
Get job alerts by email. Join Our Talent Network!

Job Snapshot

Employee Type

Contractor

Location

Hickory, NC (Onsite)

Job Type

Skilled Labor - Trades

Experience

Not Specified

Date Posted

10/16/2025

Job ID

25-63315

Apply to this job.

Think you're the perfect candidate?